45kV LAST construction for PSFV evacuation
«LAS CAPELLANÍAS» (Cáceres)

With a total length of 5,530 meters, this high-voltage power line is a key project for the transmission of green energy from the Capellanías photovoltaic plant, also built by Grupo Incalexa. The route combines overhead and underground sections with a voltage of 45 kV. The 54% section of the line runs overhead, supported by 29 metal and concrete pylons reaching a height of up to 23 meters and spanning 3,000 meters in 28 bays. The insulation used on the new pylons consists of strings with U70AB45P composite insulators, optimizing the line's safety and reliability. The underground section involves trenching with a trenching machine, a technical process that ensures efficient and safe installation.